Refundable deposit (no VAT).  

This is the meter is only used where there is a substantial electricity supply to the sub-metered unit, usually only on industrial parks.  

You might have a Three Phase mains supply to your residential site, even if it is an HMO as small as four units, but almost certainly the mains supply will have been split into individual phases inside your building, and you will want our Single Phase sub-meters.  

You will know if you need three phase sub-meters, but naturally we are happy to advise:


Power Supply

THREE Phase

Height

310mm

Width

178mm

Depth

108mm

Payment Type

Online | Phone | Auto Recharge

Cash in local shops available soon

Max Current (Amps)

100

MID Approved

Yes

Smart

Yes

Tariffs

Single | Dual | Dual + Weekend

Availability

Next Day

Model

Iskra MT382

Country of Manufacture

Slovenia


Three Phase Electricity Sub-Meter

  • Brand: Iskraemeco
  • Product Code:MT382
  • Availability:In Stock
  • £175.00


  • 2 or more £150.00
  • 4 or more £120.00

Details of Site where sub-meters are to be installed - add meters for a single site at a time to the cart